CFA Secant Pile Walls

We ensure your newly constructed structure has adequate support and is water-tight with highly resilient CFA secant pile walls.

Where Strength Meets Design

CFA secant pile walls are constructed with intersecting circular reinforced concrete piles. The secant piles are reinforced with the help of steel beams or rebar using the CFA (Continuous Flight Auger) technique. The reinforced concrete guide wall is constructed at the piling platform level, which helps to develop positional and vertical tolerances for the auger or casing. These pile walls prove to be efficient in groundwater control in various ground conditions.

Specialising in ground engineering, Metro Piling LTD. offer CFA secant pile wall construction services to residential and commercial clients at highly cost-effective rates. Whether you want us to install them as retaining wall structures or support systems for deep foundations, we have got you covered. This way, we provide retaining elements and load-bearing walls that are essential to ensure the ultimate success of various construction projects.

Secant piling is a versatile and durable solution, proving its efficiency in various use cases, which include but are not limited to:

Request a Free Estimate

Need to know how much your cost?

Our Comprehensive Construction Process

Our local specialists follow this streamlined process to construct secant pile walls:

  1. Install primary or female piles and allow them to achieve the desired level of strength.
  2. Allow the piles to cure for 2 to 4 days.
  3. Construct secondary or male piles in between primary piles by cutting into them.
  4. Install reinforced male piles when alternate piles are formed.
  5. Reinforce secondary piles with full-length steel reinforcement cages or steel sections to rock-socket them for extra loading requirements.

Being one of the most experienced piling service providers near you, we are the top choice for your next construction project.

Protection From Ground Movement

Gain Access In Restricted Locations

Stable Alternative to Deep Basements

Quick Response & Effective Lead Time

Why Choose Us?

Trusted Across Sectors for Quality Services

Latest Equipment

We have cutting-edge piling equipment to handle multiple site conditions and produce accurate results.

Specialist Team

Our SSIPs-Accredited engineers boast extensive experience in installing piling foundations for residential and commercial projects.

Diverse Solutions

We are offering a wide range of piling solutions for underpinning, foundations, retaining walls, and soil stabilisation.

Quality Assurance

Our health and safety team ensures all the projects are completed in accordance with the industrial rules and regulations.

Why Choose CFA Secant Pile Walls?

As one of the leading contractors in the UK, we offer an innovative structural piling solution in the form of CFA secant pile walls that have numerous advantages:

  • Quick Installation
  • Increased Wall Stiffness
  • Groundwater Resistance
  • Reduced Risk of Overbreak
  • Enhanced Aesthetic Appearance
  • Minimum Noise During Construction
  • Compatibility with Difficult Ground Conditions
  • Decreased Risk of Distress to Adjacent Structures
  • Efficient Support for Basement Wall Construction
blog-piles-im

Metro Piling LTD – Contact Us

Get in touch with us for efficient and reliable CFA secant pile wall construction that stands the test of time.

Frequently Asked Questions !

Which types of projects require the construction of secant pile walls?

Various construction projects require the construction of secant pile walls for efficient load-bearing, such as foundations and walls of underground storeys, framed and stand-alone bridgeheads, tunnels, and many others.

The primary piles or columns are called soft or female piles and are not reinforced. On the other hand, load-bearing, reinforced piles that are drilled to intersect the female piles are known as hard or male piles.

To reinforce CFA secant pile walls, H-beams, I-beams, Reber cages, or steel channel sections are usually installed.

On average, the diameter of secant piles varies from 600mm to 1200mm, and the overlap between primary and secondary piles is usually 8cm.