Barnet & Southgate College

Restricted Access SFA Piling

A specialist piling solution delivered in a live education environment with tight access and challenging ground conditions.
Sector
Education
Location
Barnet, London
Services
Design | SFA Piling | Testing
Status
Completed

Project Overview

Metro Piling Group was appointed to provide a complete design and installation piling package at Barnet & Southgate College.
 
The project presented a number of technical and logistical challenges, including restricted site access, approximately 4 m of made ground, underlying clay and high groundwater conditions.
 
Following assessment of the site constraints and ground conditions, Sectional Flight Auger (SFA) piling was selected to provide a practical deep foundation solution while allowing the works to be completed using compact piling equipment.

Key Project Information

Engineering & Pile Design

The piling solution was developed around the structural loading requirements, available ground investigation information and the significant access restrictions.

The works comprised 23 No. 300 mm diameter SFA piles, installed to an average depth of approximately 10.5–11.0 m.

The engineering package included:

The selected solution transferred the structural loads through the variable near-surface deposits and into the competent underlying strata.

Restricted Access SFA Piling

A key challenge was delivering the piling works within the available access and working-space restrictions.

Metro Piling mobilised a compact Cobra T12000 piling rig, allowing the SFA piles to be installed safely and efficiently without requiring a conventional large CFA piling rig.

The SFA technique uses sectional augers, making it particularly suitable for sites where headroom, access or working space restrict the use of larger piling equipment.

Each pile was reinforced using purpose-designed reinforcement cages, with the reinforcement installed following completion of the pile.

Challenging Ground Conditions

Ground conditions comprised approximately 4 m of made ground over clay, together with high groundwater.

The piling methodology was selected to maintain bore stability and provide reliable pile construction through these challenging conditions.

Careful control of the drilling and concreting process was maintained throughout the works, with pile installation records produced as part of the quality assurance procedure.

Site Delivery

Restricted access meant that mobilisation, concrete deliveries, reinforcement handling and supporting plant had to be carefully coordinated.

Metro Piling worked closely with the main contractor to manage the piling sequence, working platform, setting-out points, concrete operations and site logistics.

Despite the challenging conditions and restricted working environment, all 23 piles were successfully completed, the piling rig was demobilised and the working area was left clean and ready for the following construction activities.

A Specialist Restricted Access Solution

Barnet & Southgate College demonstrates Metro Piling Group’s capability to deliver specialist foundation solutions where restricted access and difficult ground conditions make conventional piling methods impractical.

From pile design and planning through to mobilisation, installation and completion, the works were delivered as a coordinated specialist piling package.

Restricted access. Challenging ground conditions. Engineered piling solutions.

Mobilisation on site

SFA piling in progress

Restricted access working area

Compact equipment for tight access

Working within live college environment

Successful Delivery

All 23 piles were successfully completed, with the piling rig demobilised and the site left clean and ready for the next phase of construction. Barnet & Southgate College demonstrates Metro Piling Group's capability to deliver specialist foundation solutions in restricted access locations and challenging ground conditions.

"Specialist solutions for complex environments."